The works consist of the execution of the structure, both the formwork and the pouring of the concrete. They include, among others, slab formwork using tables (more than 80,000 m2), climbed and non-climbed walls (more than 10,000 m2 formwork, screen, cores and retaining walls) and large pillars (more than 2,000 units).