HOSPITAL MONTECELO

Building structure works ABCEFH of 30 and 40 cm thick slabs carried out with the table system and / or CC4 formwork of 9 heights. Starting from level 6 slab, the slabs are 30 cm post-tensioned and at level 5 the post-tensioned slab is 60 cm with important falsework in patios.

Customer: UTE GRAN MONTECELO

Situation: PONTEVEDRA

Site Manager Of Siurell: DIEGO JERONIMO

Average Monthly Staff: 40 Workers

Duration Of The Work: In progress

Completion of the work: In progress